WePadbol

Panoramic Padbol Court

Panoramic Padbol Court Installation

Infrastructure

The existing ground should be well compacted and leveled. There should be no corrugation on the floor and the court must be concrete.

Steel Construction

Steel construction and galvanized paint processes are carried out in the wepadel factory.

Concrete Beam

By combining plywood molds, all infrastructure materials are processed in a solid way.

Tempered Glass

Special glasses of 10-12 mm are fixed to the steel construction with fasteners.

Padel Grass

Synthetic grasses obtained from special PE raw materials, with high resistance UV additives and produced in accordance with game performance, are combined in place with Joint Tape and PU Glue in accordance with the project.

Led Lighting

200 W lighting projectors are fixed by adjusting their angles and spacing to illuminate the entire field.

Drainage System

Along with the robustness of the infrastructure, a high-capacity water drainage system is integrated into the grass system.

Equipment

Padel posts, padel nets and all necessary equipment for padel are provided by wepadel.

Origin Discover Frequently Asked Questions

  • What are the differences between the Panoramic and Origin Padbol Courts?
  • Which standards is the Panoramic Padbol Court manufactured according to?
  • Is the Panoramic Padbol Court suitable for outdoor or indoor use?
  • What are the technical dimensions and height of the Panoramic model?
  • With which flooring system is the Panoramic Padbol Court delivered?
  • How long does the production and installation process of the Panoramic Padbol Court take?
  • What maintenance procedures are required for the Panoramic Padbol Court?