WePadbol

Origin Roofed Padbol Court

Origin Roofed Padbol Court
Shape 1
Shape 3
Shape 2
Wepadel Shape 1
Wepadel Shape 2
QR Code
Design
International Standards
Tempered Glass
Steel Construction
Led Lightning
Padbol Playing Surface

Origin Roofed Padbol Court Installation

Infrastructure

The existing ground should be well compacted and leveled. There should be no corrugation on the floor and the court must be concrete.

Steel Construction

Steel construction and galvanized paint processes are carried out in the wepadel factory.

Concrete Beam

By combining plywood molds, all infrastructure materials are processed in a solid way.

Tempered Glass

Special glasses of 10-12 mm are fixed to the steel construction with fasteners.

Padbol Playing Surface

The Padbol playing surface is installed on the prepared base according to the selected system and project specifications.

Led Lighting

200 W lighting projectors are fixed by adjusting their angles and spacing to illuminate the entire field.

Drainage System

For outdoor Padbol courts, drainage is planned together with the base and playing surface to remove rainwater.

Equipment

Wepadel supplies the posts, net and equipment required for the Padbol court.

Origin Roofed Padbol Court Frequently Asked Questions

  • Which standards is the Origin Roofed Padbol Court manufactured according to?
  • Is the Origin Roofed Padbol Court suitable for outdoor or indoor use?
  • What are the technical dimensions and height of the Origin Roofed model?
  • With which flooring system is the Origin Roofed Padbol Court delivered?
  • How long does the production and installation process of the Origin Roofed Padbol Court take?
  • What maintenance procedures are required for the Origin Roofed Padbol Court?
Wepadel Sport